Friday, 22 November 2013

Test trip with Julian

After my "looking forward to...." update yesterday I'm kind of continuing in the same vein but with a slightly more immediate target.

Hopefully it'll be sunny in Keswick this weekend
Hopefully it'll be sunny in Keswick this weekend
This evening I am picking up Julian and heading on up to Keswick for a weekend to see just how it is living in him, and also to check out the work which was done to fix the hookup and electrics, while meeting a few friends for some beers. I am really looking forward to getting on the road and taking him on the longest drive I have yet and also spending time in one of my favourite places in England.

Derwent Water, Keswick
Derwent Water, Keswick
I suppose in one sense this could be a "for the last time" because I am not sure if I will manage to get up to Keswick again before I leave.

There's a thought.

I'll be taking lots of pictures and will blog next week about this weekend :) here's to Julian being fully up to scratch and operating exactly how I want him to.

Ridge walking in the Lakes
Ridge walking in the Lakes
Thomas is going back into the garage next week to have his cam belt checked, and also have the slight overheating problem I have seen over the last few weeks looked at; they think it could be a water pump but we'll see. He doesn't overheat with any regularity, and when he does it is easy for me to cool the engine back down again either by moving, or putting the internal heaters on. Sitting in traffic for twenty to twenty five mins (which I do every day to work) doesn't cause any overheating so it is very strange. Hopefully they can get to the bottom of it.

With Thomas being off the road I'll have Julian up at my house (unusually) so next week I'm hoping to get to focus on building the rabbit hutch into him. Again obviously I'll take photographs and blog about this. I can't wait to see how that works out.

Sassy-bun
Sassy-bun
Finally I heard from Lubo through my contact and it seems like I may take him on to push forwards on the PUP and planning permission. He's given me a quote which is reasonable, and I'm just waiting for the contract and a Power of Attorney to be sent so I can get it signed and returned and then he can crack on with it.

It seems that the PUP is sent off and the department HAS to respond within a month and:
If the ministry does not reply within a month of receiving the letter it is considered as "silent consent" and then we could proceed.
This would be very nice indeed, if it turns out to be true.

So back to waiting for contracts and paperwork from architects; I love this, I really do!

Time is passing
Time is passing
 Only 106 days until I leave - wow it is really going fast now!

Thursday, 21 November 2013

Today I am looking forward to...

..... sitting in my front room in the summer with one of my classical vinyls playing at top volume.

..... waking up with the sun rise and seeing the mist clearing from the river valley below my bedroom window

..... watching the snow fall through my windows while listening to the fire popping in my Rocket Mass Stove

..... emptying my year 1 humanure store at the end of the second year and using it to improve the soil

..... driving up to Stara Otcheliste with my parents in mid march next year and realising "I am not leaving"

.....the first harvest from my land

and I tell you what....

.... I cannot WAIT!

Excited
Excited

Wednesday, 20 November 2013

Plastering tips and frustration

Sorry for the lack of post yesterday; I came down with a kicking migraine on Monday night and spent all of yesterday in a dark room resting up trying to sort my vision out.

Migraine face
Migraine face
So it's a general update today, with a few things that have been on my mind to record.

First of all, a few of the tips which we were given at the plastering; just to write these down for posterity.

  1. When mixing your plaster, pull the mixer out to create a tunnel in the mix. If, when you kick the side of the bucket, half of the tunnel falls in then you have the correct consistency.
  2. If possible try to put the correct amount of water in your mixing bucket before adding the plaster powder as this will help to avoid lumpiness in your mix.
  3. When trying to evaluate whether your plaster is ready for troweling off touch gently with the tips of your fingers. You are aiming for "sticky and tacky". The tip was that if the plaster pulls away and at all in little peaks, it is too wet. It should feel sticky but not follow your finger away.
  4. It's all in the angle of your wrist
yep....
yep....
So there you have a substantial collection of opportunities for "that's what she said"isms I shall move on.

I've heard from Lubo with apologies and with the news that yes, I definitely do need to have the PUP. I may have to think hard for the next couple of days to make my mind up about what to do... This is where my frustration at Veselka being so unreliable really comes to the fore. It is ridiculous that she couldn't operate to any fixed deadline and she is even now still delaying me as I was promised an email from her this weekend which never arrived.

I may be forced to pay Veselka something more to get the PUP information out of her.

FRUSTRATE
FRUSTRATE
Julian had his electrics done over the weekend, finally, though the cost in the end was a lot more than I was quoted. I am going to be up in Keswick this weekend in him so will be able to check the work out then, make sure it is worth the amount the chap charged me. I could say more about this situation but will wait for it to be resolved; suffice to say it is not just Bulgarians who cause problems.

Frustrate.

Monday, 18 November 2013

Plastering Course Weekend Two

This weekend was the second part of the four day Beginners Plastering Course.

The finish on my first attempt
The finish on my first attempt
After having such a great time last weekend and feeling really confident and happy that this was something which I can definitely do I approached this weekend with some trepidation.  Beginners luck could easily explain the results the previous weekend and also the speed and skill required would be increasing as the weekend went on.

If you remember we had skimmed the ceiling and half the big wall, after having spent the first day getting used to the environment and each other and just putting plasterboard onto a framework.

My applied plaster
My applied plaster
This weekend our task was to finish the big wall (joining this to the previously skimmed section), skim around the window (including the reveal), fill the hole we cut out for a plug socket, and then on the Sunday do an entire reskim of the whole plastered area: big wall, window wall and ceiling.

But more of that later.

His mrs washed them!
His mrs washed them!
Saturday morning arrived with a groan as the alarm went off at my usual midweek time but the motivation of "doing this for Bulgaria" helped me out of bed, into the kitchen and towards my first brew of the day. When I arrived (with my overalls still dirty) there was much amusement as my mate's wife had got hole of his and he was clean again.

Such is the humour of boys and workmen.

With much less ceremony than last week we were set to to mix up a load of plaster and on with plastering the wall around the window. While this was being mixed we each went round with a scraper and took the blobs and lumps of plaster dripped from the ceiling onto the wall off.

This week we were allowed to use the slightly nicer trowel however, as I stood on my step-up and took my trowel in hand loaded with plaster I suddenly realised that I had forgotten how to hold the thing! It took two or three attempts and then suddenly it all fell back into place and the plaster started going onto the wall nicely again.

First coat, troweled up, flattened
First coat, troweled up, flattened
First application, troweling up, second coat the troweling up again and flatten twice; plastering is a skill which depends upon speed of application and then being ready for when the next stages should be started. Just as it goes tacky is when you start troweling up. Flattening is slightly less time-dependent but you do NOT want to try it when the plaster has gone off too far or you will start pulling the plaster rather than smoothing it and then will have a large amount of sanding to do (which kind of defeats the object of plastering).

First around the window
First around the window
When the window wall was done I went on to plastering the reveal around the window. This was rather a fun challenge as the space was very limited and the plasterboard was actually quite bowed and therefore I had to pack the curve to ensure a flat application. I actually learned a LOT from this very small step in terms of how to build up plaster into a dip and how to press it down with the correct force to ensure it is flat.

The tiling course work and Len removing it
The tiling course work and Len removing it
While we were doing the plastering the tutors were going around knocking down the other walls, ripping tiles off, and generally tidying and clearing so the next course would have a space to start learning plastering. It was a sad sight to see such excellent tiling as this come smashing off the walls.

Soaked the join
Soaked the join
After lunch we had to plaster the rest of the large wall which included joining to the half we plastered last weekend. The technique here is simple; you must wet the old plaster thoroughly and then smooth the new plaster across onto the wet area really firmly. Once you have a smooth finish you can then scrape the overlapping new plaster off to ensure a smooth join.

The large wall all plastered
The large wall all plastered
The rest of the wall went on nicely and all of our techniques were now starting to come together and the results we were achieving now were making all of us feel a little better. I was still applying my first coat too thinly however my trowel angle for troweling off and flattening was much better.

The end of the day was us attempting to fill in the hole from the plug socket and learning about dot and dab which is a technique for sticking plasterboard to a wall to allow you to then easily plaster over a large area without having to render the wall.

Filling the hole ended up being a real pain - you measure a section of plasterboard slightly narrower, and slightly taller, than the gap and the push a nail through. You then load it up with plasterboard concrete and push it through the hole, while holding onto the nail. You then carefully push the nail through and hopefully the block will not fall out. This didn't quite work the first time but the second I loaded loads of the concrete stuff onto the board and held it for ages and it stayed.

So to home and much sadness watching the All Blacks beat England at rugby. Oh well.

Glue to be put on the old plaster
Glue to be put on the old plaster
The next morning was even tougher to drag myself out of bed for... plastering is very physical and I was starting to ache already. Not only that, but Sunday was the day when we were doing a full reskim of the ceiling and every wall - something which had taken all of the previous two days of plastering. The thing with this is plaster goes off very much quicker when it is skimmed over old plaster and so we would have to work much faster and more efficiently than we had all through the previous days of working.

Applying the glue with the roller
Applying the glue with the roller
The trick to plastering over old plaster is to provide a non-porous surface over the old plaster; we did this with a 3-1 mix of PVA glue and water. This was applied with a roller and then the new plaster went on a bit easier; not that it didn't go off much quicker, but we had time at least to put a load on before troweling up.

First reskim coat
First reskim coat
First the roof and by half way through I thought my arm was going to fall off. It was a case of mind over matter and just keep lifting and spreading and trying to get as good coverage as I possibly could while moving fast as it dried so quickly (as we were warned it would). By the time the first load was up I had to go straight to the beginning and trowel it off. This in comparison with about a five minute wait for the plastering onto fresh plasterboard. A minor victory on my second coat as I managed to put too much plaster on the ceiling where I had always til this point been too stingy with my application. This was solved by a heavy handed troweling off and the spare plaster went onto someone else's ceiling who had run out.

Roof and end all done
Roof and end all done
After the first break we went onto the window wall using the same technique and then after lunch we did the entirety of the large wall which was a REALLY big challenge.

... and the big wall
... and the big wall
I ran out of plaster and so had to start troweling off before I had finished the wall, as the applied plaster was going off so quickly. Fortunately Len, our excellent tutor, was hard at work making more mixes so we weren't short of plaster for long.

All in all this course has been excellent - I feel so much more comfortable to pick up a trowel and get involved in helping with the plastering in Bulgaria however I think I'll have to build myself some practice walls in my storage unit and keep my hand in as it is shocking how quickly you forget the techniques and how to hold the trowel etc.

Len the tutor
Len the tutor
One other thing to say; I had a really good chat through the course with Len who has renovated a number of houses in france and was very interested in my plans for the school. Fingers crossed we'll stay in touch and he can come out and see what I am doing.

I got SOME on the walls
I got SOME on the walls
Cheers Len.

Friday, 15 November 2013

I have a confession to make....

... I'm pretty damn terrified of this whole thing.

Me, last night
Me, last night
No, really. I am.

Not all the time, not even most of the time, but every now and then all the possibilities of what others may term "failure" come flooding into my mind and I cannot help but to think on them.

What happens if, when I get there, I have another four months of planning to go through before I can do any work on the school? What if this even includes the roof! How will I cope with having to live in Julian for that long... Even worse, what if I cannot get a temporary contract for the electric and I don't even have electricity on the site?!

Then to the slightly longer term concerns such as how will I keep my motivation up through the entire period of the build, particularly if (when) there are delays caused by waiting for materials, people and approval for plans. How will I cope being out there all on my own through this process? Will the fact of being alone allow me to avoid what I need to do and result in the renovation not being done to the standard which I aspire?

This is what I need....
This is what I need....
It is at times like these (for example last night as I was going to sleep) when I really respect what my friend has done out there.

It is from her which I draw my strength and reassurance.

It is possible, and there is no reason not to give it a go.

The other side of the coin which I challenge myself with at times like these is "What is failure?"

So what if I go out there, give this a go and realise it isn't for me. Who cares. The only failure in life is the failure to try and I am giving it a go.

These demons don't surface that often but they do surface. They will surface for you if you start to plan something like I am doing. They should be used to help you look coldly and clearly at your plans and to encourage yourself that you are not going into it blindly.

So, if you are thinking of emigrating, or even if your plans aren't as grand as that (maybe changing jobs or something) then remember; fears and worries can be used to educate yourself. Don't be scared of fear.

You can reach your promised land
You can reach your promised land
And just go for it.

Thursday, 14 November 2013

Default decision

The decision has been made without me really needing to make any decision at all.

I have been VERY impressed with the response times of the companies in Sofia however my concern is that I will be entering into another uncertain contract and I will find it very difficult to get anything arranged and nailed down without at least one if not two trips to their offices. This is not something which I want to take on at this time.

Unfortunately it seems that Lubo suffers from the same problems that Veselka did; he just hasn't kept to his agreed communication timetable. From promising beginnings, where Martin got back to me and said that Lubo was up for it and would be in touch by Wednesday, I have heard nothing. And that wasn't Wednesday yesterday, but Wednesday last week.

It is amazing to me that people make agreements and just don't bother keeping them, though I suppose that may reflect more on me and the fact I try to keep my word. So old fashioned I know.

This leaves me with the final choice which is to see what I can manage to achieve with the help of my friend and Bekir before I get there and pick up the rest when I arrive. I should be able to get Electric connected but first I need to get the survey done and that is in hand next week maybe. Also Bekir is going to pop in to see the chief architect for me in the next couple of weeks to finally get the understanding of what needs to happen.

The concern is if all this information I have received from Sylvia is bunkum and this lady at the Obshtina doesn't actually know what is going on either.

I still have some dealings with Veselka as I am waiting for her to send the paperwork to my friend. The last communication I got (and I will be chasing again after I post this) is that she is waiting for some progress on the PUP. I am not entirely sure why she is still doing this as I have told her to stop; the only thing I can think of is that she is waiting for the new skitza, and the application for PUP which she already sent in.

Anyway, this whole "emigrating but staying in England" thing has proven to be a difficult thing to try to do; hopefully once I am there I can be more in control of what is needed and get the approvals I need quickly. I hope it doesn't end up taking six months after I arrive but I can't help wondering if it will. If it does, what can I do.

This is all part of the rich tapestry of life.

No pictures today.... too busy to look for good ones....

Monday, 11 November 2013

Little bits and batts

After the extensive and interesting blog post of yesterday, today I have a slightly more bitty-post.

Panicked phone call
Panicked phone call
Yesterday (Monday) the men arrived to swap out the shutter on the unit. I have no idea how this has gone as of yet (as I write this) but presumably it has gone well as I haven't received any panicked phone calls.

I don't even know if I have got the keys back yet so I can gain access to the unit; the time the men arrived was well before my studio opens so a neighbour had to give them the keys. Hopefully they have been dropped off at the studio or at the very least they can be picked up from the helpful neighbour (who also provided a fork lift truck) tomorrow.

It is a couple of weeks yet til I'm back there (next weekend is part two of the plastering course....) so I have to patient before I see it. Hopefully my business partner can get round to pushing the trailer inside the unit at least so it is out of the rain and weather and secure from potential thieves.

One use for Marine Plywood
One use for Marine Plywood
Anyway this is good as it means the next free weekend (December, I believe) I will be over there and getting more stuff done. I need to get some Marine Ply to put in the base of the trailer so there is no risk of damage should the trip be wet (and when I bring the trailer to my current house to collect the table I'm sat at now, which will be soon, it almost certainly will be raining so I need this for then). I can go to the friendly builders merchant round the corner for this and also see if he has had my heavy duty padlock delivered yet.

Another thing which occurred to me yesterday (and I have asked my very-long-suffering business partner to assist me on this) is I really should have measured at least the hole I'd made when removing the fridge. In two weeks I am taking Julian on a test trip up to the Lake District and if I have that open I will positively freeze!

COLD!
COLD!
I've asked him to send me a drawing of the dimensions of the hole so I can start designing the rabbit hutch but before anything I will cut out a piece of wood to the correct size and then just whack it in the hole when I collect Julian on my mad dash to the lakes that Friday evening.

What could possibly go wrong.

I haven't heard from the Camper Van Guy about the electrics since I saw him a week ago so I may have to put a chase out on him this evening or tomorrow; I am really having to learn to be organised with this process as there is so much to think about and it would be so easy to just forget something and then screw up.

He has until the end of next week to complete all the work so having gone quiet for a week is not the greatest of things.

Rambo
Rambo
Finally for now I think that Rambo is getting a new cage which will fit in the back of Thomas. It is still not clear in my head what I am going to do but mainly this is because the parents are still on holiday and I want to talk to them about their feelings. I haven't heard back from the pet transport people who were recommended so I think I will have to chase them also.

Chase chase chase......