![]() |
Bekir clamps the door frame |
![]() |
A lick of paint on the wall |
![]() |
Back to the shuttering work |
![]() |
Tulips line the (needing replacing) front path |
![]() |
The Tortoise Garden is bursting into colour |
![]() |
More bulbs beside the lawn |
![]() |
Working on fitting the lintels |
![]() |
Sally hammering nails into a shutter |
![]() |
Far column is shuttered |
![]() |
Finishing touches on the door surround |
![]() |
Fitting the cross shuttering in place |
![]() |
Bekir fitting the blind in Rosie's bedroom |
![]() |
Halil drilling to secure more rebar in place |
![]() |
Blind to keep the sun out during the day |
So there you are; the week is done. Thanks for reading.
No comments:
Post a Comment