Tuesday 10 October 2023

Cement on the stairs

Hopefully today's update will be short so let's get to it.

Chipping and sweeping
Chipping and sweeping
Removing the shuttering
Removing the shuttering
Tidying the step faces
Tidying the step faces
A skim for the mid landing
A skim for the mid landing
Cement on the ledge above the door
Cement on the ledge above the door

The men were in on time and got stuck in to their task continuing to work on the stairs. First of all Bekir cleaned up all the work he'd done yesterday while Halil removed the shuttering on the side of the stairs. With this done they got started on a second cost on the faces of the steps, and also tidying the sides. Next up was a skim onto the mini landing half way up and then finally they tidied the ledge above the door. They really are getting close to carpet now, though Bekir said he wants to do another coat of plaster on the walls first, and there is still some cement work to be done actually up on the main floor level.

Ends for the raised bed
Ends for the raised bed

For myself I got out for a little time to do the next step on the new raised bed. It was too windy to finish this off so hopefully I'll do that tomorrow.

Thelma and Louise with bones
Thelma and Louise with bones

I'll leave you with this picture of Thelma and Louise with their bones. Xena had been sharing earlier but wasn't around at the time of the picture.