Pool pump, but it didn't work out
Pool pump, but it didn't work out
Look at all that filth in the bottom of the tank
Look at all that filth in the bottom of the tank
Water being evacuated out through the wall
Water being evacuated out through the wall
There goes the water
There goes the water
Final dirty water being removed
Final dirty water being removed

The men were in nicely on time and were up to the roof to get stuck in to the main task for today which was switching out the old water container with a new one. We had the idea to use the pool pump to help get the water out however it wouldn't actually fit into the tank so Bekir just started a manual syphon which worked well. We also ran a couple of the taps around the house to help. Inside the tank there was a lot of sand and mud, this is from when we had really dirty water for quite a while. Disgusting! It didn't take long really to empty the tank and they did the last bits out on the roof terrace.

Bekir getting stuck into the re-plumbing
Bekir getting stuck into the re-plumbing
Vacuuming and drilling going on
Vacuuming and drilling going on
Overflow hole drilled out
Overflow hole drilled out

With the old tank out the way it was pretty quick to get the new one into place and then Bekir set to with the plumbing in. This involved drilling holes, bending in new pipes (as this new tank is twice the size of the last one) and Halil was assisting including with a vaccuum while Bekir drilled holes. They got it done and turned the water on so that the tank could refill in time for bath night.

Halil gets stuck into plastering
Halil gets stuck into plastering
Bekir sweeping before joining in the plastering
Bekir sweeping before joining in the plastering
Finally got this tree dug out
Finally got this tree dug out
Yet another raised bed built
Yet another raised bed built
The tank is nearly filled
The tank is nearly filled

What a great success - this early completion of the main task meant that the men could get back in to the roof space which I really want to have completed very soon; Halil was plastering by the stairs while Bekir was tidying and also got stuck into the plastering a bit. I can't wait for the stairs to be done and the carpet to be down! I went outside while Angela collected Rosie and I finished digging out the tree by the entrance gate. I started this weeks ago but then got sick so it has waited for weeks. When they got back we all hung out on the patio and I put together another raised bed for Angela. Just before dinner I checked the tank in the roof and it was an inch or so off completely full so that's great.