Another Friday reached, and the last update for a while as the men are taking next week off.
|
Halil starts to remove the cement from the drains |
|
Tough work in the hot sun |
|
Bekir scraping as well |
|
Nearly done on this task now |
|
Putting up a curtain pole |
Today has been all about the patio and smoothing and scraping it. It has been a long hot day for Bekir and Halil but by the end of it they really had taken a lot of the roughness off the surface. It's such a pleasure to see it all done and now they are left with the toilet pump house, and then the grates and doors on the collection point. It's a bit frustrating to lose all of next week as well as it probably means they'll have to work into August to get the toilets done now. After finishing up outside they came in and put up the new curtain pole in Rosie's Playroom so now that can be kept dark at night for her, and cooler during the day.
|
In the shade |
|
Super happy Rosie with drawings by Mummy |
After I finally finished work, and it was hot on the balcony again today, I played with Rosie for a bit then we went in the pool. It's so good to have that and the way she loves being out there is wonderful.
So there you are; another week done. Thanks for reading.
No comments:
Post a Comment