Angela woke up this morning a lot sick (she is already a lot better now thankfully) while all through today I've felt steadily worse so hopefully mine is just as short lived. I've been busy as well, and the men have just cracked on as usual so let's get to it.

Halil attaches the mesh
Halil attaches the mesh
Bekir attaches the light fittings
Bekir attaches the light fittings
We have a light switch, nearly
We have a light switch, nearly
Plastering away
Plastering away
Planning tomorrow's tasks
Planning tomorrow's tasks

The first thing Halil did was mesh and plaster over the expanding foam he had squirted into the gaps yesterday and then he was on to doing the same but over the wood work on the unplastered wall to the left of the double doors. Bekir was working on the lights still and through today he got them all wired up and even the light switch in so now these lights are working. With the mesh over the wood Halil continued his plastering and has done the entirety of that part of the wall. We are quickly moving towards the time to move all the electrics and then work on the stairs, which is very exciting. Tomorrow Bekir will be running the pipes from the solar boilers out along the crawl space so we can consider that area completed.

Very dark clouds heading our way
Very dark clouds heading our way

I'll leave you with a picture of the weather heading our way; April is treating us to some storms and rain. Fun.

So there it is; here's to waking up feeling well tomorrow. Thanks for reading and back soon.