After the epic of yesterday we're back to a more normal update today.
|
Bekir cuts a hole for the light fitting |
|
Conduit and cable in place |
|
Drilling out for an in-the-wall box |
|
Halil plastering over the top of the expanding foam |
|
Light switch cable |
The workmen were in and progressing the job upstairs all day. First of all Bekir cut out holes for lights at the top of the stairs and then ran the cables through conduit and down to where the junction box will sit. He then drilled that all out so when they get to plastering this back wall the conduit won't be in the way. Halil had a few bits to do in town but when he got back he worked on filling the little gaps at the top of the walls with expanding foam, then trimming it down and plastering over the top of it. Bekir was, the last time I got a picture, working on where the new lightswitch will go and making sure the cables were in place. I had to head into town to get the final bits done for insuring Maisie, which was a very easy task this time and so we're all ready for the trip.
So there it is; a nice short update thankfully. Back tomorrow and thanks for reading.
No comments:
Post a Comment