Another day and we're back to the update. Another short one today so let's get to it.
|
Bekir starts working on the shelf supports |
|
Halil starts plastering for the day |
|
Bekir working in tight spaces |
|
Lots of cleaning! |
|
Looking at the leaky tap |
|
Shiny new tap |
|
Bekir plasters inside the new window |
When the men arrived I asked Bekir to pop up into the roof to swap the uprights that were the wrong size for the supports however because the screw holes were in a different place it was better to ask him to do the drilling. While he was doing that Halil mixed up plaster and got stuck into applying the second layer. Bekir joined him as soon as he could and went into the really low area to do the plastering in there. Angela was getting a really good deep clean going on in the kitchen which is looking great! Mid afternoon Angela noticed that the tap in the kitchen was leaking so Bekir had a look and found the broken part however we were not able to source a replacement so got a new tap instead. We'll now get the old tap repaired and it can be held in reserve for another application. The final task for Bekir was working on the outside of the new window. Halil was just plastering and plastering all day.
|
Rosie with Sammy |
When we got home from school there was time for a visit to Sammy and then a little playing outside before we got to our Lord of the Rings video.
So there you are; thanks for reading and back tomorrow!
No comments:
Post a Comment